Indian Railways completes longest tunnel on strategic Sivok-Rangpo route

Key Points
Indian Railways has completed excavation of the longest tunnel on the Sivok-Rangpo line, marking a major milestone in bringing Sikkim closer to its first-ever railway connectivity.
New Delhi, Nov 28: Indian Railways has achieved a major milestone in the Sivok-Rangpo New Line Railway Project with the successful breakthrough of Tunnel No. 10, the longest tunnel on the route.
The achievement marks the completion of excavation work in all 14 tunnels of the project, bringing Sikkim closer to its first railway connection.
Tunnel No. 10, stretching 5.3 km, was excavated from both ends with the help of two access tunnels. With the breakthrough completed, work will now move to tunnel lining, track laying and installation of railway safety systems.
Also read: Automatic e-challans from December 1 on Daitari-Chandikhol highway
📱 Get Argus News App
✨The 45-km broad-gauge railway line will connect Sivok in West Bengal with Rangpo in Sikkim, passing through Darjeeling, Kalimpong and Pakyong districts. Built across challenging Himalayan terrain, nearly 86 per cent of the route runs through tunnels.
Once operational, the Sivok-Rangpo railway line will provide direct rail connectivity to Sikkim, offering residents and tourists a safer, faster and more reliable alternative to National Highway 10.
The project is expected to improve the movement of essential goods, boost tourism and provide better market access for local businesses.
Besides the 14 tunnels, the railway line includes 23 bridges and stations at Sivok, Riyang, Melli and Rangpo, along with an underground halt at Teesta Bazaar. At Sivok, it will connect with the existing New Jalpaiguri-Alipurduar route, linking Sikkim to the national railway network.
The Sivok-Rangpo Railway Project is considered a landmark infrastructure initiative aimed at enhancing connectivity in Sikkim and strengthening rail links across the Northeast.
(IANS)
Related Topics
Explore more stories